The Human Mission

The 14-phase plan to send humans to the Red Planet — and keep them alive.

01
Recruitment & Selection
Who goes to Mars — and how they are chosen.
8–12 years before launch (approximately 2028–2033 for a late 2030s mission)
02
Training & Preparation
Years of physical, psychological, and technical preparation.
5–10 years before launch
03
Mission Architecture
Designing the spacecraft, timeline, and overall mission plan.
2030–2040 (design finalization 2025–2030)
04
Launch & Transit
The 180-day journey through deep space.
2035–2040 (first crewed transit)
05
Mars Orbit & Entry
Orbital insertion, descent, and landing on the Red Planet.
Mid-2030s to 2040s
06
First Hours on Mars
Immediate priorities the moment the crew steps out.
First crewed Mars landing: late 2030s–early 2040s
07
Habitat Construction
Building a home that keeps you alive.
26 months before crew arrival (robotic pre-deployment); crew occupation begins ~2040 in optimistic scenarios
08
Life Support Systems
Air, water, and pressure — the machinery of survival.
Operational during all surface mission phases; system development 2025–2035
09
Food & Water
Growing, extracting, and recycling everything you consume.
5–8 years before mission departure (system development); operational throughout the 30-month mission
10
Power Generation
Nuclear, solar, and the energy backbone of the colony.
5–10 years before first crewed landing; deployment with early cargo missions circa 2035–2038
11
Science & Exploration
Doing the work that justifies being there.
Months 7–24 of surface stay (approximately 2040–2045 mission window)
12
Long-Term Colonization
From outpost to permanent settlement.
2060s–2100s and beyond
13
Terraforming
The centuries-long project to make Mars habitable.
2200s and beyond
14
Return to Earth
The journey home — if you choose to make it.
Surface departure ~500 days after landing; 7–9 month return transit; total mission duration 900–1,000+ days